Finally the weather allowed for some continues building and this resulted in the "twisted" carport floor being poured, with some comments from passers-by :That 's not straight" to "Did the boxing sag".... all to the amusement of everyone on site.Then a major job in the positioning of the scaffolding, especially on such a steep site.Looking up from the south at the construction it looks embarrassingly massive. We will be glad when it can all be taken down and the completed relatively small (by local standards) building will be visible.However access all round is now much safer and it will speed up the building process dramatically. Two days ago the plywood working flooring on the upper floor was fixed down and sealed . This means we can walk around the floor we will be living on most of the time and adjust the final position of the proposed windows to make the most of the sun, trees and distant views. The next stage will be the framing of the upper floor and roof when we will be able to see the full extent of the building.